Provincial Site Standards for SSMUH (vs. Traditional Zoning)
Permit ScopeThe province has established standardized physical development guidelines that municipalities must meet or exceed:
| Development Metric | Traditional Single-Family Rules | New Provincial SSMUH Standard |
|---|---|---|
| Allowable Units | 1 Primary Dwelling + 1 Suite | 3 to 6 Units As-of-Right |
| Maximum Building Height | Typically 2 Storeys (~7.5–8.5m) | 11.0 Metres (Approx. 3 Storeys) |
| Front Yard Setback | Varies (Often 6.0m–7.5m) | Minimum 2.0 Metres |
| Rear Yard Setback | Varies (Often 6.0m–7.5m) | Minimum 1.5 Metres |
| Maximum Lot Coverage | Typically 35%–40% | 50% (Up to 60% for 3-unit infill) |
| Off-Street Parking Mandate | 1 to 2 stalls per unit | 0 Stalls Required (Near frequent transit) |
Step 1 — Determining Your Lot's Unit Yield
Phase 01Under Bill 44, your property's allowable density is primarily governed by lot area and proximity to public transit networks:
- Lots 280 m² (3,014 sq ft) or smaller: Permitted for a minimum of 3 dwelling units.
- Lots larger than 280 m²: Permitted for a minimum of 4 dwelling units.
- Bill 44 frequent-transit bus stops (6 units): Lots larger than 280 m² within 400 metres of a prescribed frequent-transit bus stop are permitted a minimum of 6 dwelling units (Housing Statutes (Residential Development) Amendment Act, 2023; Local Government Act s.481.3). Cities apply this on their own maps, such as Burnaby's Frequent Transit Network Area. As of Oct 2026. Provincial SSMUH page.
- Bill 47 transit-oriented areas are separate: Bill 47 sets minimum density and height around SkyTrain stations and bus exchanges, out to 800 metres. It is not the 6-unit SSMUH rule and it is not a 400-metre SkyTrain toggle. Provincial TOA page.
- Vancouver R1-1: Vancouver uses its own multiplex table. As of Oct 2026, 3–4 units need at least 306 m² and 10.0 m of frontage; 5 units need at least 464 m² and 13.4 m; 6 units, or up to 8 if secured as rental, need at least 557 m² and 15.1 m. Neither measurement can be relaxed. Multiple-dwelling FSR is 1.00. Sites larger than about 463 m² or wider than 13.3 m must provide at least 4 units. R1-1 schedule and the Low Density Housing Options How-to Guide.
Even in smaller or non-prescribed communities, the legislation guarantees the right to build at least one secondary suite or detached accessory dwelling unit (ADU) on most residential properties.
Step 2 — Verifying Municipal Exemptions
Phase 02While SSMUH rules apply broadly across BC, certain properties are legally exempt from the 3-to-6 unit mandate:
- Unserviced Parcels: Lots not connected to both municipal piped water and community sanitary sewer services.
- Acreage Properties: Lots larger than 4,050 m² (approx. 1 acre).
- Heritage Designations: Properties protected under municipal heritage bylaws or revitalization agreements.
- Agricultural & Environmental Reserves: Land within the Agricultural Land Reserve (ALR) or designated environmental/hazard zones.
Step 3 — Building floor plans & Livability Optimization
Phase 03Designing a high-density multiplex requires meticulous interior layout optimization to maximize leasable square footage without compromising tenant livability:
- Efficient Circulation: Utilizing space-saving scissor stairs, exterior egress stairs, and central mechanical chases to eliminate dead hallway square footage.
- Acoustic & Visual Privacy: Arranging living areas and bedrooms away from shared party walls, designing discrete private entrances, and staggering outdoor balcony locations.
- Accessible Ground-Floor Suites: Integrating single-level accessible living units compliant with the BC Building Code Accessibility Handbook.
Step 4 — Fire Separations, STC Acoustics & Step Code Engineering
Phase 04Multi-unit residential buildings are subject to strict Part 9 and Part 3 life-safety provisions under the BC Building Code:
- Fire separations: Dwelling-unit separations are 45 minutes, or 1 hour where a unit is two or more storeys (BCBC 2024 Sentences 9.10.9.16.(1) and (3)). Confirm the assembly against the code edition and the city.
- Sound: Between a secondary suite and the rest of the house, STC 43 or ASTC 40 (Sentence 9.11.1.1.(2)). Between other dwelling units, STC 50 or ASTC 47.
- BC Energy Step Code: Coordinating with a Certified Energy Advisor (CEA) to ensure complex multi-unit envelopes achieve airtightness and thermal performance targets.
Step 5 — Municipal Submission, Review & Mandatory Site Inspections
Phase 05Canadian Blueprint packages your drawings into single-layer vector PDF drawing sets ready for digital municipal portals:
- Municipal digital portals: In Vancouver, a multiplex is applied for through the City of Vancouver's Development and Business Services website (a separate account from the permit and Van311 accounts). Submit the development permit first, then the building permits. If each building has 1–2 units and the site is not in First Shaughnessy, those applications can go in together. Other cities: the Surrey permitting portal (MySurrey account), the Burnaby My Permits Portal, Richmond MyPermit, or Coquitlam QFile. Burnaby SHiFT (launched July 22, 2026) is a feasibility tool. Housing Design Library permits are not expedited. The SSMUH Acceleration Program has not launched.
- Sequential Site Inspections: From excavation and foundation surveys through rough-in trades, thermal envelope airtightness testing, and fire-separation inspections before drywall taping.
- Master Guide: Read our Complete BC Building Permit Approval Process for full details on municipal review timelines.
Ready to Unlock Your Property’s Development Potential?
Get StartedWhether you are planning a duplex, fourplex, or a 6-unit transit multiplex, Canadian Blueprint delivers permit-ready blueprints that maximize density and streamline approvals across British Columbia.
Prefer the process first? Read the 8-step approval guide SSMUH Policy Guide.
Canadian Blueprint Inc.
BC Building Design & Permit Drawings