Skip to content
BC Building Code Part 3 vs Part 9
General Guide

BC Building Code Part 3 vs Part 9

In British Columbia, the dividing line between Part 9 and Part 3 of the BC Building Code determines whether you legally require a Registered Architect, your municipal plan check timeline, and overall engineering costs. Here is the exact breakdown of the 600 m² footprint, 3-storey height limit, and major occupancy thresholds.

Quick Comparison: Part 9 vs. Part 3 Buildings in BC

Key structural, height, square footage, and professional sign-off differences between Part 9 housing and Part 3 complex buildings.

FeaturePart9Part3Significance
Building Height LimitMaximum 3 storeysOver 3 storeys (or high-rise)4-storey+ buildings automatically trigger Part 3 fire protection rules.
Maximum Building AreaUp to 600 m² (approx. 6,458 sq ft) footprintExceeds 600 m² footprint (or high hazard)Larger footprints trigger Part 3 complex building status.
Major Occupancies CoveredResidential (C), Small Business (D), Small Retail (E), Low-Hazard Industrial (F3)Assembly (A), Care/Detention (B), High-Hazard Industrial (F1/F2), & Large C/D/EAssembly uses like restaurants or daycares often push small spaces into Part 3.
Professional Design (Architect/AIBC)Qualified Drafting / Design Firm (No Architect required unless complex)Mandatory Registered Architect & Professional Engineers (Letters of Assurance)Saves tens of thousands in professional fees on Part 9 projects.

Project Roadmap & Scope of Work

Select a phase below to jump to the details

  1. 1
    The Core Thresholds (Area, Height & Use)
  2. 2
    Townhomes vs. Condos
  3. 3
    Mandatory Architect Rules
  4. 4
    Pre-Permit Verification Checklist

Overview & Context

Overview

Whenever a client contacts Canadian Blueprint to design a new build, secondary suite, or commercial renovation, one of the first technical checks we run is determining whether the structure falls under Part 9 or Part 3 of the BC Building Code (BCBC).

This distinction is crucial because it governs: 1. Who can draw and stamp your plans (Qualified Drafting Firm vs. Registered Architect & Certified Engineers). 2. How long municipal plan checks take (Part 9 residential sets stream through faster). 3. Construction costs & fire protection requirements (sprinkler systems, fire separations, standpipes, and exit stairs).

Step 1: The Core Thresholds (Area, Height & Use)

Phase 01

Under the BC Building Code, the baseline rule separating Part 9 and Part 3 comes down to three physical criteria: Building Height, Footprint Area, and Occupancy Type.

Part 9: Housing and Small Buildings

  • A building qualifies under Part 9 if it satisfies ALL of the following:
  • Height: 3 storeys or less in building height.
  • Building Area (Footprint): 600 square metres (approx. 6,458 sq ft) or less.
  • Occupancy Types Allowed:
  • Group C (Residential: single-family homes, duplexes, triplexes, townhomes, secondary suites).
  • Group D (Business & Personal Services: offices, beauty salons, small clinics).
  • Group E (Mercantile / Retail: small shops, retail stores).
  • Group F, Division 2 & 3 (Medium & Low-Hazard Industrial: small workshops, storage garages).
Part 9 Envelope Assembly Part 9 residential wall assembly cross-section diagram
Part 9 Residential Envelope: 3D building cross-section detailing 2×6 wood framing, continuous exterior insulation, rainscreen strapping, and Step Code energy compliance.

Part 3: Fire Protection, Occupant Safety & Accessibility (Complex Buildings)

  • A building is classified under Part 3 if it meets ANY of the following conditions:
  • Height: Exceeds 3 storeys (e.g., 4-storey wood-frame apartments or high-rises).
  • Building Area: Exceeds 600 m² (6,458 sq ft) in building footprint.
  • Special Occupancy Types: Automatically includes Group A (Assembly: theatres, large restaurants, churches, arenas), Group B (Care/Treatment: hospitals, nursing homes), or Group F1 (High-Hazard Industrial).

Step 2: Townhomes vs. Condominiums

Phase 02

Homeowners and real estate investors often ask why renovating a townhome is different than renovating a condo unit, even if both are residential dwellings:

Townhomes (Typically Part 9)

  • Most standard 2 to 3-storey townhome developments in BC are constructed under Part 9.
  • Individual units are separated vertically by fire-rated demising party walls that extend from the foundation to the underside of the roof deck.
  • Permit Advantage: Renovating or altering non-structural interior layout elements in a Part 9 townhome can typically be handled by a qualified drafting firm without hiring a registered Architect.

Condominiums & Apartment Buildings (Part 3)

  • Condos situated in 4-storey+ wood-frame complexes, mid-rises, or concrete high-rises are classified under Part 3.
  • Units are separated both vertically and horizontally by floor-ceiling assemblies and demising walls designed to strict acoustic and fire resistance ratings.
  • The Catch: Altering walls, plumbing stacks, or common elements in a Part 3 condo unit requires strict compliance with Part 3 fire-stopping and structural rules. In many municipalities (like Vancouver, Surrey, or Burnaby), modifications affecting common demising walls or exterior envelopes in Part 3 buildings mandate Architect or Professional Engineer sign-off.

Step 3: Mandatory Architect & AIBC Regulations

Phase 03

Under the *Architects Act* of BC and regulations enforced by the Architectural Institute of British Columbia (AIBC), you are legally required to retain a Registered Architect if your project falls into any of these categories:

1. All Part 3 Major Occupancy Buildings: Any new construction, major addition, or structural alteration to a Part 3 building (over 3 storeys or over 600 m² footprint). 2. Assembly & Care Occupancies: Buildings used for Group A (Assembly) or Group B (Care & Treatment) regardless of size (subject to minor low-occupant-load exceptions like Note A-3.1.2.6). 3. Commercial Tenant Improvements Affecting Exterior Envelopes or Fire Demising Walls: If your commercial renovation alters common fire separations or exterior building envelopes in a Part 3 multi-tenant building, an Architect or Coordinating Registered Professional (CRP) is generally required to issue Letters of Assurance (Schedule A, B, C-A, C-B).

Part 3 Commercial Fire Assembly Part 3 commercial structural steel and fire separation cutaway
Part 3 Commercial Fire Assemblies: Engineered structural frame, 2-hour ULC fire separations, automated sprinkler risers, and exit stairwells requiring registered professional Letters of Assurance.

When Can You Use a Qualified Drafting Firm (Canadian Blueprint)?

For Part 9 residential and commercial projects—including new custom homes, duplexes, multiplexes under Bill 44 SSMUH, secondary suite legalizations, laneway houses, and small business tenant improvements—you do NOT need to pay for a registered Architect. A professional drafting firm can produce complete, permit-ready CAD/BIM drawing sets at a fraction of the cost.

Step 4: Pre-Permit Verification Checklist

Phase 04

Before submitting building permit plans in BC, follow this quick checklist to confirm your compliance path:

  1. Measure Footprint & Count Storeys: Is your building footprint under 600 m² (6,458 sq ft) and 3 storeys or less?
  2. Check Your Occupancy Group: Is your business or residence classified under Group C, D, E, or F2/F3?
  3. Verify Architect & Engineering Requirements: If Part 9, engage Canadian Blueprint for cost-effective CAD/BIM permit sets. If Part 3, determine if Letters of Assurance (Schedules A, B, C) are required.
BC Building Code Scope Part 3 vs Part 9 BC Building Code blueprint sets and Letters of Assurance comparison
Code Path Determination: Clarifying whether your project falls under Part 9 prescriptive housing standards or Part 3 complex engineering determines required professional stamps, municipal review tracks, and overall drafting costs.
Canadian Blueprint Logo

Canadian Blueprint Inc.

BC Building Design & Permit Drawings

Published • Updated

Back to Guides

Need drawings for this project?

Free feasibility review. We check zoning and code, then send a clear quote. Typical reply in 2–4 business hours.

Get a Free Feasibility →

Let's Get Started

Take the next step in your building journey with our specialized design and permit services.

Residential
Homes, suites & outbuildings
  • As-Built Measuring
  • New Custom Homes
  • Home Renovations
  • SSMUH / Multiplex
  • Accessory Buildings & Garages
  • 3D Visualization
Learn More →
Commercial
Business spaces & TI
  • As-Built Measuring
  • Tenant Improvements
  • Change of Use Permits
  • Business Renovations
  • First-Time Business Setup
  • Commercial Space Planning
Learn More →