Full Permit Application Management
General

Full Permit Application Management

Surrey and Burnaby take building permit applications online. Confirm the Energy Step Code level with the city, and include the documents that city's checklist asks for. This page lists the items both cities commonly require.

Full Application Management

If you are searching for a City of Surrey building permit checklist or a City of Burnaby building permit checklist, you already know that BC municipalities run a tight ship. Since the province rolled out centralized digital submission portals, both cities have moved to fully paperless reviews. That means your application must be complete before you click Submit. One missing signature or incorrectly scaled drawing triggers an automatic hold.

Planning to submit your completed drawings through your city's digital portal yourself? Follow our step-by-step DIY Municipal Online Building Permit Applications Guide to learn how to access your city's portal, upload vector PDF sets, and pay intake fees directly without third-party surcharges.

In 2026, permit reviewers in both Surrey and Burnaby are cross-checking submissions against three layers simultaneously:

  • Local Zoning Bylaws (lot coverage, height, setbacks, tree protection)
  • BC Building Code & Step Code (energy targets, airtightness, thermal bridging)
  • SSMUH & Multiplex Rules (if converting single-family to multi-unit)

What Surrey Looks For

Surrey’s ePermit system prioritizes site servicing and environmental overlays. Common requirements include:

  • A completed Zoning Confirmation Letter (ZCL) from City Planning.
  • Tree protection plans if any trunk exceeds 60 cm DBH on-site.
  • Grading and drainage plans showing how runoff will be managed, especially near the Nicomekl or Serpentine floodplains.
  • Utility capacity confirmation for added suites or laneway homes.

What Burnaby Looks For

Burnaby is highly structured around energy compliance and geotechnical stability:

  • Energy Step Code documents for the level the City applies. Confirm that level before specifying the package.
  • Geotechnical reports if your lot has slope grading >15% or is in the Burnaby Mountain corridor.
  • Heritage screening if the property falls within a designated Character Area.
  • Signed professional engineering for structural, mechanical, and electrical systems.
  1. 1
    Confirm Zoning & Site Eligibility
  2. 2
    Compile Building Permit & Site Drawings
  3. 3
    Gather Engineering & Energy Compliance Docs
  4. 4
    Upload, Pay, & Track via Municipal Portal

The Complete Permit Document Stack

Whether you are in Surrey or Burnaby, your submission folder must include:

  1. Application Form & Fees — calculated via the city's online estimator.
  2. Site Plan — scaled 1:200, showing property lines, setbacks, existing/proposed structures, and drainage paths.
  3. Building Permit Drawings — floor plans, elevations, sections, and door/window schedules.
  4. Structural & Mechanical Drawings — foundation, framing, HVAC layout, and HRV sizing.
  5. Energy Compliance Package — Hot2000 output, airtightness testing plan, and Step Code checklist.
  6. Professional Seals — CEA or PE stamps where municipal bylaws require them.

Missing any of these items triggers a "Request for Further Information" (RFI) status, pausing your review clock. The average delay for an incomplete submission in 2026 is 14–21 business days.

Why Stock Checklists Fail

Free checklists online rarely account for municipal nuances. Burnaby requires metric-only submissions with specific title block headers. Surrey demands a separate arborist report for retained trees over a certain diameter. Our checklist bundles both city requirements into a single, pre-submission workflow.

Surrey & Burnaby Permit Checklist: What Matters Most

A quick homeowner's guide to the most important permit requirements and common pitfalls in Surrey and Burnaby.

Focus AreaWhat It Means for YouKey Considerations
Surrey RequirementsSurrey requires tree protection plans, grading and drainage details, and floodplain compliance for many lots. Zoning confirmation is mandatory.Check for tree protection bylaws, confirm site grading, and ensure all utility and zoning documents are included.
Burnaby RequirementsApply through the My Permits Portal. Confirm the Energy Step Code level with the City. Geotechnical reports apply where the lot needs them. SHiFT (launched July 22, 2026) is a feasibility tool. Housing Design Library permits are not expedited. The SSMUH Acceleration Program has not launched.Prepare energy compliance docs, check if your lot needs a geotechnical report, and use the city's digital checklist.
Common RejectionsApplications are often rejected for missing title blocks, unsigned engineering, or incomplete site grading info. Each rejection adds weeks to your timeline.Double-check all signatures, seals, and document formatting before submitting.

Download the Free BC Permit Checklist

Check the signature, the form, and the portal name before you upload. Surrey uses its permitting portal with a MySurrey account. Burnaby uses the My Permits Portal. The checklist below follows current municipal portals and the BC Building Code.

Contact Canadian Blueprint to have us prepare your submission package.

FAQ: Stop Guessing. Start Submitting.

How long does a building permit take in Surrey or Burnaby?

Surrey residential review is often 10–14 weeks. Burnaby has reported an average residential review of about 13 days (as of Oct 2026). That Burnaby figure is review time, not permit issuance. An incomplete file can take longer. Burnaby applications go through the My Permits Portal. SHiFT, launched July 22, 2026, is a feasibility tool. Housing Design Library permits are not expedited. The SSMUH Acceleration Program has not launched.

Do I need an engineer for a single-family home?

Part 9 prescriptive work does not always need a Letter of Assurance. Part 4 design does (BCBC 2024 Division C 2.2.7). Canadian Blueprint prepares the permit drawings. A Certified Technician does not seal Schedule B. When a professional engineer is required, a P.Eng. provides that seal.

Can I submit my permit application by mail or in person?

No. Surrey and Burnaby operate fully digital submission portals as of 2024. All plans, forms, and supporting documents must be uploaded as single-page PDFs with clear file naming conventions.