Skip to content
Chilliwack Building Permit Fees
Permit Fee Schedule & Costs

Chilliwack Permit Fees & Deposits Guide

Bylaw fee schedules, sliding valuation scales, refundable damage deposits, and required upfront plan check deposits for construction in Chilliwack, BC.

← Back to Chilliwack Resource Hub • Updated for Active BC Bylaw Rates

When budgeting a construction or renovation project in Chilliwack, municipal permit fees and refundable damage securities represent essential upfront expenditures. Rather than simple flat charges, Chilliwack calculates building permit costs based on total construction value, paired with refundable damage deposits to protect public infrastructure.

Whether you are planning a secondary suite, laneway dwelling, custom single-family home, multiplex addition, or commercial tenant improvement, this guide clarifies how City Hall calculates fees, what securities are required at intake, and how to submit drawing packages for municipal plan review.

Chilliwack Permit Fee Quick Calculator

Official Bylaw Sliding Scale Estimator

Select your project classification and enter estimated construction valuation below to calculate the base permit rate, upfront intake plan check deposit, and refundable damage deposits.

Municipal Fee Notice: These figures calculate official statutory review charges and refundable damage deposits collected directly by Chilliwack City Hall. They do not include Canadian Blueprint's drafting or design pricing.
Explore Design Pricing →
$
Estimated Base Permit Fee $0.00 City of Chilliwack Building Regulation Bylaw 2003, No. 2970 (Schedule B, consolidated March 16, 2021)
Upfront Intake Deposit $0.00 Plan check charge credited toward permit
Refundable Damage Deposit $0.00 Subject to municipal site inspection
City Hall Fees Only: 100% of these calculated figures are statutory municipal charges paid directly to Chilliwack City Hall during permit intake. They do not include Canadian Blueprint's drafting, design, or engineering fees.
Explore Design Pricing →

* Damage deposits are held by Chilliwack and refunded upon final building inspection approval. These estimates do not include trade permits (plumbing, electrical, or gas), municipal development cost charges, amenity cost charges, or regional development cost charges. Those development-stage charges are often the largest cost on a new unit. As of Oct 2026.

Step-by-Step Breakdown

How Chilliwack Assesses Your Permit Fees

1

Value Assessment

City examiners evaluate declared contract costs against standardized valuation schedules ($/sq ft).

2

Bylaw Sliding Scale

Base fees scale progressively based on project scope, square footage, and declared value.

3

Security Deposits

Refundable damage deposit protects sidewalks, boulevards, curbs, and road assets during construction.

4

Intake Plan Check

An intake deposit initiates active plan examination with Chilliwack building officials.

Official Municipal Rates

Permit Fee Structure

City of Chilliwack fee calculations are based on project valuation, floor area, and municipal plan-check review costs.

Official Chilliwack Building Bylaw Fees
Notice: Fees are estimates based on municipal bylaws and subject to City of Chilliwack verification during intake.
Category / Project Scope Minimum / Base Fee Incremental Rate / Notes
Permit Application Fee
Building Regulation Bylaw 2003, No. 2970, Schedule B item 1(9). $300 flat, per application
Construction Value ($1k–$100k)
Single/two-family and ancillary residential: $100 for the first $1,000. $6.50 per additional $1,000
Construction Value ($100k–$250k)
Single/two-family and ancillary residential. $6.20 per additional $1,000
Construction Value (Over $250k)
Single/two-family and ancillary residential. $5.80 per additional $1,000
Commercial, Industrial & Apartments
Townhouses and rowhouses are 0.95% of construction value. 1.1% of construction value
Skip City Hall Red Tape

Navigating Chilliwack Hall Shouldn't Delay Your Build

Municipal fees only cover plan review. Plan checking typically takes 4–8 weeks, depending on the municipality and project. That range is typical plan-check time, not a promise and not the date the permit is issued. Missing zoning data sheets or drawing details that do not meet the BC Building Code can bring a deficiency notice and add review time. Canadian Blueprint prepares permit drawing packages for municipal plan check. Where a city publishes a figure, treat it as review time, not the date the permit is issued.

Get a Free Permit Quote → Permit drawing packages for municipal plan check

Why Work With Canadian Blueprint

  • ✓
    Intake-Ready Drawing Sets Tailored specifically to Chilliwack municipal submittal standards.
  • ✓
    Zero Plan Examiner Surprises Full spatial separation, setback, and height zoning calculations.
  • ✓
    Deficiency Resolution Included Direct response to municipal comments to help keep your permit review moving.
Navigation & Portals

Related Chilliwack Permit Resources