When is a Feasibility Study Needed?
Audit TriggersMajor additions, secondary suite legalizations, multiplex conversions, or commercial Tenant Improvements require regulatory clearance before starting design. You need a study if:
- Evaluating a Property Purchase: Confirming maximum allowable Floor Space Ratio (FSR), unit density under Bill 44, or building envelope constraints before subject removal.
- Planning a Major Renovation or Addition: Auditing historical archive records to check if unpermitted past modifications already maxed out legal floor area.
- Complex Environmental or Heritage Overrides: Siting within a Development Permit Area (DPA), riparian watercourse buffer, or encountering statutory rights-of-way.
- Resolving an Active Stop Work Order: Establishing an objective compliance roadmap to legalize unpermitted construction with municipal inspectors.
Understanding the Feasibility Matrix
Feasibility MatrixWe audit your project parameters across all critical zoning and building code criteria:
| Review Criteria | Compliance Status | Analysis & Requirements |
|---|---|---|
| Setbacks | Compliant | Project fits within standard front, rear, and side building envelopes. |
| Floor Space Ratio (FSR) | Verified | Existing floor area and proposed scope audited against municipal gross floor area maximums. |
| Lot Coverage | Modification Required | Proposed layouts slightly exceed allowable limits; footprint reduction required. |
| Impermeable Surface | Revision Needed | Total hardscape exceeds local limits; needs adjustments to permeable options. |
| Building Height | Revision Needed | Maximum height for sloped roofs is 7.5m; roofline profiles must be revised. |
| Rights-of-Way & DPAs | Compliant | No encumbrances or riparian buffer conflicts within the proposed construction zone. |
| Geotechnical Engineer | Required | Site features soil or slope conditions that require a registered P.Eng. |
Step 1: Property Intake
Phase 01We gather your address, look up site records via municipal GIS maps, and clarify your layout goals or any active city enforcement issues.
Step 2: Bylaw & Code Analysis
Phase 02Our team audits local land-use bylaws, identifying specific density caps, height thresholds, and development permit triggers.
Step 3: Compliance Mapping
Phase 03We cross-reference your project goals against physical lot lines, right-of-way tracks, and building classification systems to find potential bottlenecks.
Step 4: Feasibility Report
Phase 04We deliver a complete compliance breakdown, mapping out your exact development capacity and listing the required professionals for your permit path.
Know What You Can Build Before You Commit
Get StartedCanadian Blueprint delivers comprehensive zoning and code feasibility reports to eliminate costly guesswork and verify development potential across BC.
Prefer the process first? Read the 8-step approval guideDIY Permitting Hub.
Canadian Blueprint Inc.
BC Building Design & Permit Drawings