Skip to content
Victoria Building Permit Fees
Permit Fee Schedule & Costs

Victoria Permit Fees & Deposits Guide

Bylaw fee schedules, sliding valuation scales, refundable damage deposits, and required upfront plan check deposits for construction in Victoria, BC.

← Back to Victoria Resource Hub • Updated for Active BC Bylaw Rates

When budgeting a construction or renovation project in Victoria, municipal permit fees and refundable damage securities represent essential upfront expenditures. Rather than simple flat charges, Victoria calculates building permit costs based on total construction value, paired with refundable damage deposits to protect public infrastructure.

Whether you are planning a secondary suite, laneway dwelling, custom single-family home, multiplex addition, or commercial tenant improvement, this guide clarifies how City Hall calculates fees, what securities are required at intake, and how to submit drawing packages for municipal plan review.

Victoria Permit Fee Quick Calculator

Official Bylaw Sliding Scale Estimator

Select your project classification and enter estimated construction valuation below to calculate the base permit rate, upfront intake plan check deposit, and refundable damage deposits.

Municipal Fee Notice: These figures calculate official statutory review charges and refundable damage deposits collected directly by Victoria City Hall. They do not include Canadian Blueprint's drafting or design pricing.
Explore Design Pricing →
$
Estimated Base Permit Fee $0.00 Victoria Building Bylaw Fee Schedule
Upfront Intake Deposit $0.00 Plan check charge credited toward permit
Refundable Damage Deposit $0.00 Subject to municipal site inspection
City Hall Fees Only: 100% of these calculated figures are statutory municipal charges paid directly to Victoria City Hall during permit intake. They do not include Canadian Blueprint's drafting, design, or engineering fees.
Explore Design Pricing →

* Damage deposits are held by Victoria and refunded upon final building inspection approval. These estimates do not include trade permits (plumbing, electrical, or gas), municipal development cost charges, amenity cost charges, or regional development cost charges. Those development-stage charges are often the largest cost on a new unit. As of Oct 2026.

Step-by-Step Breakdown

How Victoria Assesses Your Permit Fees

1

Value Assessment

City examiners evaluate declared contract costs against standardized valuation schedules ($/sq ft).

2

Bylaw Sliding Scale

Base fees scale progressively based on project scope, square footage, and declared value.

3

Security Deposits

Refundable damage deposit protects sidewalks, boulevards, curbs, and road assets during construction.

4

Intake Plan Check

An intake deposit initiates active plan examination with Victoria building officials.

Official Municipal Rates

City of Victoria - Detailed Permit Fees Guide

A detailed breakdown of common permit fees for new builds, renovations, and demolitions in Victoria.

Detailed fee schedule
Notice: This is a guide only. Official fees are determined by the City at the time of application and are subject to change.
Category / Project Scope Minimum / Base Fee Incremental Rate / Notes
Administrative Fees
Records Access Fee
(Plan Search)
$25
Written Statement
or Report
$50
Bonds / Deposits
Excavation Deposit 1.2 times estimated
cost to backfill
Building & Plumbing
Application Fee
(at time of application)
$100
Permit Fee
(before issuance)
1.40% of cost
of construction*
*Excludes plumbing
& electrical value
Plumbing Permit Fee 1.40% of cost of
plumbing work + $100
Work Without Permit 2.8% of cost
up to $20,000
+ 1.4% of cost
over $20,000
Revision After Issuance Greater of
(i) or (ii)
i. 10% of original fee
+ new permit fee
ii. Not less than $100
Re-inspection Fee $50
Permit Extension $100
Electrical Permits (Additional Fees)
Re-inspection Fee $40
Work Without Permit Double Fees
Electrical Permits (Contractor)
Work Value
$1 - $1,000
$36 - $61 See detailed schedule
Work Value
$1,001 - $20,000
$61 + $20 per
$1,000 of value
Work Value
Over $20,000
$441 + 1.25% x
Value over $20,000
Electrical Permits (Homeowner)
Homeowner Permit Fee Fee based on 2x
material costs
See detailed schedule
Miscellaneous Permits & Fees
Blasting Permit $150
Sign Permit $100 For each sign
Skip City Hall Red Tape

Navigating Victoria Hall Shouldn't Delay Your Build

Municipal fees only cover plan review. Plan checking typically takes 4–8 weeks, depending on the municipality and project. That range is typical plan-check time, not a promise and not the date the permit is issued. Missing zoning data sheets or drawing details that do not meet the BC Building Code can bring a deficiency notice and add review time. Canadian Blueprint prepares permit drawing packages for municipal plan check. Where a city publishes a figure, treat it as review time, not the date the permit is issued.

Get a Free Permit Quote → Permit drawing packages for municipal plan check

Why Work With Canadian Blueprint

  • ✓
    Intake-Ready Drawing Sets Tailored specifically to Victoria municipal submittal standards.
  • ✓
    Zero Plan Examiner Surprises Full spatial separation, setback, and height zoning calculations.
  • ✓
    Deficiency Resolution Included Direct response to municipal comments to help keep your permit review moving.
Navigation & Portals

Related Victoria Permit Resources