Victoria Permit Fees & Deposits Guide
Bylaw fee schedules, sliding valuation scales, refundable damage deposits, and required upfront plan check deposits for construction in Victoria, BC.
When budgeting a construction or renovation project in Victoria, municipal permit fees and refundable damage securities represent essential upfront expenditures. Rather than simple flat charges, Victoria calculates building permit costs based on total construction value, paired with refundable damage deposits to protect public infrastructure.
Whether you are planning a secondary suite, laneway dwelling, custom single-family home, multiplex addition, or commercial tenant improvement, this guide clarifies how City Hall calculates fees, what securities are required at intake, and how to submit complete drawing packages for first-round approval.
Victoria Permit Fee Quick Calculator
Official Bylaw Sliding Scale Estimator
Select your project classification and enter estimated construction valuation below to calculate the base permit rate, upfront intake plan check deposit, and refundable damage deposits.
* Damage deposits are held by Victoria and refunded upon final building inspection approval. Does not include trade permits (plumbing/electrical/gas) or regional DCC development charges.
How Victoria Assesses Your Permit Fees
Value Assessment
City examiners evaluate declared contract costs against standardized valuation schedules ($/sq ft).
Bylaw Sliding Scale
Base fees scale progressively based on project scope, square footage, and declared value.
Security Deposits
Refundable damage deposit protects sidewalks, boulevards, curbs, and road assets during construction.
Intake Plan Check
An intake deposit initiates active plan examination with Victoria building officials.
City of Victoria - Detailed Permit Fees Guide
A detailed breakdown of common permit fees for new builds, renovations, and demolitions in Victoria.
| Category / Project Scope | Minimum / Base Fee | Incremental Rate / Notes |
|---|---|---|
| Administrative Fees | ||
| Records Access Fee (Plan Search) | $25 | |
| Written Statement or Report | $50 | |
| Bonds / Deposits | ||
| Excavation Deposit | 1.2 times estimated cost to backfill | |
| Building & Plumbing | ||
| Application Fee (at time of application) | $100 | |
| Permit Fee (before issuance) | 1.40% of cost of construction* | *Excludes plumbing & electrical value |
| Plumbing Permit Fee | 1.40% of cost of plumbing work + $100 | |
| Work Without Permit | 2.8% of cost up to $20,000 | + 1.4% of cost over $20,000 |
| Revision After Issuance | Greater of (i) or (ii) | i. 10% of original fee + new permit fee ii. Not less than $100 |
| Re-inspection Fee | $50 | |
| Permit Extension | $100 | |
| Electrical Permits (Additional Fees) | ||
| Re-inspection Fee | $40 | |
| Work Without Permit | Double Fees | |
| Electrical Permits (Contractor) | ||
| Work Value $1 - $1,000 | $36 - $61 | See detailed schedule |
| Work Value $1,001 - $20,000 | $61 + $20 per $1,000 of value | |
| Work Value Over $20,000 | $441 + 1.25% x Value over $20,000 | |
| Electrical Permits (Homeowner) | ||
| Homeowner Permit Fee | Fee based on 2x material costs | See detailed schedule |
| Miscellaneous Permits & Fees | ||
| Blasting Permit | $150 | |
| Sign Permit | $100 | For each sign |
Navigating Victoria Hall Shouldn't Delay Your Build
Municipal fees only cover plan review. Missing zoning data sheets or non-compliant BC Building Code details trigger formal deficiency notices that delay your permit 4 to 8 weeks. Canadian Blueprint prepares complete, intake-ready CAD permit drawing packages engineered for smooth first-round approvals.
Why Work With Canadian Blueprint
- ✓ Intake-Ready Drawing Sets Tailored specifically to Victoria municipal submittal standards.
- ✓ Zero Plan Examiner Surprises Full spatial separation, setback, and height zoning calculations.
- ✓ Deficiency Resolution Included Direct response to municipal comments so your project stays on schedule.
Related Victoria Permit Resources
Let's Get Started
Take the next step in your building journey with our specialized design and permit services.
- As-Built Measuring
- New Custom Homes
- Home Renovations
- SSMUH / Multiplex
- Accessory Buildings & Garages
- 3D Visualization
- Stop Work Order Management
- Zoning Bylaw Check
- Building Classification Analysis
- Setback & Height Requirements
- Development Permit Triggers
- Required Professionals
- As-Built Measuring
- Tenant Improvements
- Change of Use Permits
- Business Renovations
- First-Time Business Setup
- Commercial Space Planning