Skip to content
Vancouver Building Permit Fees
Permit Fee Schedule & Costs

Vancouver Permit Fees & Deposits Guide

Bylaw fee schedules, sliding valuation scales, refundable damage deposits, and required upfront plan check deposits for construction in Vancouver, BC.

← Back to Vancouver Resource Hub • Updated for Active BC Bylaw Rates

When budgeting a construction or renovation project in Vancouver, municipal permit fees and refundable damage securities represent essential upfront expenditures. Rather than simple flat charges, Vancouver calculates building permit costs based on total construction value, paired with refundable damage deposits to protect public infrastructure.

Whether you are planning a secondary suite, laneway dwelling, custom single-family home, multiplex addition, or commercial tenant improvement, this guide clarifies how City Hall calculates fees, what securities are required at intake, and how to submit drawing packages for municipal plan review.

Vancouver Permit Fee Quick Calculator

Official Bylaw Sliding Scale Estimator

Select your project classification and enter estimated construction valuation below to calculate the base permit rate, upfront intake plan check deposit, and refundable damage deposits.

Municipal Fee Notice: These figures calculate official statutory review charges and refundable damage deposits collected directly by Vancouver City Hall. They do not include Canadian Blueprint's drafting or design pricing.
Explore Design Pricing →
$
Estimated Base Permit Fee $0.00 Vancouver Building Bylaw Fee Schedule
Upfront Intake Deposit $0.00 Plan check charge credited toward permit
Refundable Damage Deposit $0.00 Subject to municipal site inspection
City Hall Fees Only: 100% of these calculated figures are statutory municipal charges paid directly to Vancouver City Hall during permit intake. They do not include Canadian Blueprint's drafting, design, or engineering fees.
Explore Design Pricing →

* Damage deposits are held by Vancouver and refunded upon final building inspection approval. These estimates do not include trade permits (plumbing, electrical, or gas), municipal development cost charges (a development cost levy in Vancouver), amenity cost charges, or regional development cost charges. Those development-stage charges are often the largest cost on a new unit. As of Oct 2026. Vancouver DCL and ACC rates.

Step-by-Step Breakdown

How Vancouver Assesses Your Permit Fees

1

Value Assessment

City examiners evaluate declared contract costs against standardized valuation schedules ($/sq ft).

2

Bylaw Sliding Scale

Base fees scale progressively based on project scope, square footage, and declared value.

3

Security Deposits

Refundable damage deposit protects sidewalks, boulevards, curbs, and road assets during construction.

4

Intake Plan Check

An intake deposit initiates active plan examination with Vancouver building officials.

Official Municipal Rates

2025 Permit Fees & Costs Guide

Typical 2025 Permit fees for homes, renovations, and commercial projects. Fees are usually paid in stages.

Detailed fee schedule
Notice: This is a guide only. Official fees are determined by the City at the time of application and are subject to change.
Category / Project Scope Minimum / Base Fee Incremental Rate / Notes
Building Grade Calculation
For new builds &
Major additions
$633 For a standard lot with
Applicant-provided survey
Electrical Permit
Required for any
Electrical work
$101.10 Scales based on
Value of electrical work
Plumbing Permit
Required for any
Plumbing work
$270 For first 1-3 fixtures
Sign Permit
For new exterior signage $432 Standard sign; varies
By type and complexity
Single Family/Duplex
Demolition Permit
Additional Green Demo
Deposit, Where applicable
$1,500 Plus a refundable
$14,650 deposit
If required
Step 1-Commercial TI
Development Permit
Zoning & Use approval $1,400
Per 100m²
Based on
area of alteration
Step 1-Multi-Family
Development Permit
Zoning & Use approval $2,720
Per 100m²
Scales with
total project size
Step 1-Single Detached
House Development Permit
Zoning & Use approval $4,280 Typical for a
Conditional approval
Step 2-All Construction
Building Permit
Construction approval $208 $13.30 per $1,000 of
Value (over $5,000)
Tree Removal Permit
Per tree to be removed $108 For the first tree
$310 for each subsequent
Skip City Hall Red Tape

Navigating Vancouver Hall Shouldn't Delay Your Build

Municipal fees only cover plan review. Plan checking typically takes 4–8 weeks, depending on the municipality and project. That range is typical plan-check time, not a promise and not the date the permit is issued. Missing zoning data sheets or drawing details that do not meet the BC Building Code can bring a deficiency notice and add review time. Canadian Blueprint prepares permit drawing packages for municipal plan check. Where a city publishes a figure, treat it as review time, not the date the permit is issued.

Get a Free Permit Quote → Permit drawing packages for municipal plan check

Why Work With Canadian Blueprint

  • ✓
    Intake-Ready Drawing Sets Tailored specifically to Vancouver municipal submittal standards.
  • ✓
    Zero Plan Examiner Surprises Full spatial separation, setback, and height zoning calculations.
  • ✓
    Deficiency Resolution Included Direct response to municipal comments to help keep your permit review moving.
Navigation & Portals

Related Vancouver Permit Resources