Skip to content
Surrey Building Permit Fees
Permit Fee Schedule & Costs

Surrey Permit Fees & Deposits Guide

Bylaw fee schedules, sliding valuation scales, refundable damage deposits, and required upfront plan check deposits for construction in Surrey, BC.

← Back to Surrey Resource Hub • Updated for Active BC Bylaw Rates

When budgeting a construction or renovation project in Surrey, municipal permit fees and refundable damage securities represent essential upfront expenditures. Rather than simple flat charges, Surrey calculates building permit costs based on total construction value, paired with refundable damage deposits to protect public infrastructure.

Whether you are planning a secondary suite, laneway dwelling, custom single-family home, multiplex addition, or commercial tenant improvement, this guide clarifies how City Hall calculates fees, what securities are required at intake, and how to submit drawing packages for municipal plan review.

Surrey Permit Fee Quick Calculator

Official Bylaw Sliding Scale Estimator

Select your project classification and enter estimated construction valuation below to calculate the base permit rate, upfront intake plan check deposit, and refundable damage deposits.

Municipal Fee Notice: These figures calculate official statutory review charges and refundable damage deposits collected directly by Surrey City Hall. They do not include Canadian Blueprint's drafting or design pricing.
Explore Design Pricing →
$
Estimated Base Permit Fee $0.00 Surrey Building Bylaw Fee Schedule
Upfront Intake Deposit $0.00 Plan check charge credited toward permit
Refundable Damage Deposit $0.00 Subject to municipal site inspection
City Hall Fees Only: 100% of these calculated figures are statutory municipal charges paid directly to Surrey City Hall during permit intake. They do not include Canadian Blueprint's drafting, design, or engineering fees.
Explore Design Pricing →

* Damage deposits are held by Surrey and refunded upon final building inspection approval. These estimates do not include trade permits (plumbing, electrical, or gas), municipal development cost charges, amenity cost charges, or regional development cost charges. Those development-stage charges are often the largest cost on a new unit. As of Oct 2026. Surrey development cost charges (Bylaw 21174). Surrey amenity cost charges.

Step-by-Step Breakdown

How Surrey Assesses Your Permit Fees

1

Value Assessment

City examiners evaluate declared contract costs against standardized valuation schedules ($/sq ft).

2

Bylaw Sliding Scale

Base fees scale progressively based on project scope, square footage, and declared value.

3

Security Deposits

Refundable damage deposit protects sidewalks, boulevards, curbs, and road assets during construction.

4

Intake Plan Check

An intake deposit initiates active plan examination with Surrey building officials.

Official Municipal Rates

City of Surrey - 2025 Permit Fees Guide

A summary of common Permit fees for new builds, renovations, and tenant improvements in Surrey, based on the 2025 fee schedule. To calculate the main Building Permit fee, please use the City's online calculator (link below). Important: The calculator shows the 35% upfront deposit, not the total fee. For example, for a $100,000 residential construction, the calculator shows a $506.80 deposit, meaning the total fee is $1,448.

Official Fee Calculator
Notice: This is a guide only. Official fees are determined by the City at the time of application and are subject to change.
Category / Project Scope Minimum / Base Fee Incremental Rate / Notes
Commercial TI
Interior alterations $224 This is the minimum fee
It scales with construction value
Damage Deposit
Required for work
valued over $20,000
$2,500 Refundable upon
Project completion.
Demolition Permit
Existing building $583 Flat fee
Sign Permit
New exterior signage $97 Flat fee
Skip City Hall Red Tape

Navigating Surrey Hall Shouldn't Delay Your Build

Municipal fees only cover plan review. Plan checking typically takes 4–8 weeks, depending on the municipality and project. That range is typical plan-check time, not a promise and not the date the permit is issued. Missing zoning data sheets or drawing details that do not meet the BC Building Code can bring a deficiency notice and add review time. Canadian Blueprint prepares permit drawing packages for municipal plan check. Where a city publishes a figure, treat it as review time, not the date the permit is issued.

Get a Free Permit Quote → Permit drawing packages for municipal plan check

Why Work With Canadian Blueprint

  • ✓
    Intake-Ready Drawing Sets Tailored specifically to Surrey municipal submittal standards.
  • ✓
    Zero Plan Examiner Surprises Full spatial separation, setback, and height zoning calculations.
  • ✓
    Deficiency Resolution Included Direct response to municipal comments to help keep your permit review moving.
Navigation & Portals

Related Surrey Permit Resources