Skip to content
Richmond Building Permit Fees
Permit Fee Schedule & Costs

Richmond Permit Fees & Deposits Guide

Bylaw fee schedules, sliding valuation scales, refundable damage deposits, and required upfront plan check deposits for construction in Richmond, BC.

← Back to Richmond Resource Hub • Updated for Active BC Bylaw Rates

When budgeting a construction or renovation project in Richmond, municipal permit fees and refundable damage securities represent essential upfront expenditures. Rather than simple flat charges, Richmond calculates building permit costs based on total construction value, paired with refundable damage deposits to protect public infrastructure.

Whether you are planning a secondary suite, laneway dwelling, custom single-family home, multiplex addition, or commercial tenant improvement, this guide clarifies how City Hall calculates fees, what securities are required at intake, and how to submit drawing packages for municipal plan review.

Richmond Permit Fee Quick Calculator

Official Bylaw Sliding Scale Estimator

Select your project classification and enter estimated construction valuation below to calculate the base permit rate, upfront intake plan check deposit, and refundable damage deposits.

Municipal Fee Notice: These figures calculate official statutory review charges and refundable damage deposits collected directly by Richmond City Hall. They do not include Canadian Blueprint's drafting or design pricing.
Explore Design Pricing →
$
Estimated Base Permit Fee $0.00 Richmond Building Bylaw Fee Schedule
Upfront Intake Deposit $0.00 Plan check charge credited toward permit
Refundable Damage Deposit $0.00 Subject to municipal site inspection
City Hall Fees Only: 100% of these calculated figures are statutory municipal charges paid directly to Richmond City Hall during permit intake. They do not include Canadian Blueprint's drafting, design, or engineering fees.
Explore Design Pricing →

* Damage deposits are held by Richmond and refunded upon final building inspection approval. These estimates do not include trade permits (plumbing, electrical, or gas), municipal development cost charges, amenity cost charges, or regional development cost charges. Those development-stage charges are often the largest cost on a new unit. As of Oct 2026.

Step-by-Step Breakdown

How Richmond Assesses Your Permit Fees

1

Value Assessment

City examiners evaluate declared contract costs against standardized valuation schedules ($/sq ft).

2

Bylaw Sliding Scale

Base fees scale progressively based on project scope, square footage, and declared value.

3

Security Deposits

Refundable damage deposit protects sidewalks, boulevards, curbs, and road assets during construction.

4

Intake Plan Check

An intake deposit initiates active plan examination with Richmond building officials.

Official Municipal Rates

City of Richmond - Permit Fees Guide

A summary of common permit fees in Richmond. NOTE: These fees are based on an older bylaw and may be outdated. Always confirm current rates with the City of Richmond.

Detailed fee schedule
Notice: This is a guide only. Official fees are determined by the City at the time of application and are subject to change.
Category / Project Scope Minimum / Base Fee Incremental Rate / Notes
Boulevard Inspection Charge
Single/Two-Family new builds,
additions and demolitions
$197.00 Flat fee
Building Permit
$0 - $1,000
Construction Value
$81.75 Flat fee
$1,001 - $100,000
Construction Value
$81.75 Plus $13.50 per
$1,000 over $1,000
$100,001 - $300,000
Construction Value
$1,418.25 Plus $12.75 per
$1,000 over $100,000
Over $300,000
Construction Value
$3,968.25 Plus $10.25 per
$1,000 over $300,000
Demolition Costs
Buildings over 538 sq ft $509
Inspection Fee
Plus $3.25 per sq ft
Waste Service Fee
Plan Processing Fee
Paid at time of application. 50% of estimated
Building Permit Fee
Up to a max.
of $10,000
Plumbing Permit
Calculated per fixture. $81.75 $30.75 per fixture
Sign Permit
Fee is based on sign area. $88
Application Fee
Plus permit fee
e.g., $112 for signs < 15 m²
Tree Removal Permit
One tree per 12-month period. $65.25 Hazard trees are free
$78.75 per additional tree
Skip City Hall Red Tape

Navigating Richmond Hall Shouldn't Delay Your Build

Municipal fees only cover plan review. Plan checking typically takes 4–8 weeks, depending on the municipality and project. That range is typical plan-check time, not a promise and not the date the permit is issued. Missing zoning data sheets or drawing details that do not meet the BC Building Code can bring a deficiency notice and add review time. Canadian Blueprint prepares permit drawing packages for municipal plan check. Where a city publishes a figure, treat it as review time, not the date the permit is issued.

Get a Free Permit Quote → Permit drawing packages for municipal plan check

Why Work With Canadian Blueprint

  • ✓
    Intake-Ready Drawing Sets Tailored specifically to Richmond municipal submittal standards.
  • ✓
    Zero Plan Examiner Surprises Full spatial separation, setback, and height zoning calculations.
  • ✓
    Deficiency Resolution Included Direct response to municipal comments to help keep your permit review moving.
Navigation & Portals

Related Richmond Permit Resources