Richmond Permit Fees & Deposits Guide
Bylaw fee schedules, sliding valuation scales, refundable damage deposits, and required upfront plan check deposits for construction in Richmond, BC.
When budgeting a construction or renovation project in Richmond, municipal permit fees and refundable damage securities represent essential upfront expenditures. Rather than simple flat charges, Richmond calculates building permit costs based on total construction value, paired with refundable damage deposits to protect public infrastructure.
Whether you are planning a secondary suite, laneway dwelling, custom single-family home, multiplex addition, or commercial tenant improvement, this guide clarifies how City Hall calculates fees, what securities are required at intake, and how to submit drawing packages for municipal plan review.
Richmond Permit Fee Quick Calculator
Official Bylaw Sliding Scale Estimator
Select your project classification and enter estimated construction valuation below to calculate the base permit rate, upfront intake plan check deposit, and refundable damage deposits.
* Damage deposits are held by Richmond and refunded upon final building inspection approval. These estimates do not include trade permits (plumbing, electrical, or gas), municipal development cost charges, amenity cost charges, or regional development cost charges. Those development-stage charges are often the largest cost on a new unit. As of Oct 2026.
How Richmond Assesses Your Permit Fees
Value Assessment
City examiners evaluate declared contract costs against standardized valuation schedules ($/sq ft).
Bylaw Sliding Scale
Base fees scale progressively based on project scope, square footage, and declared value.
Security Deposits
Refundable damage deposit protects sidewalks, boulevards, curbs, and road assets during construction.
Intake Plan Check
An intake deposit initiates active plan examination with Richmond building officials.
City of Richmond - Permit Fees Guide
A summary of common permit fees in Richmond. NOTE: These fees are based on an older bylaw and may be outdated. Always confirm current rates with the City of Richmond.
| Category / Project Scope | Minimum / Base Fee | Incremental Rate / Notes |
|---|---|---|
| Boulevard Inspection Charge | ||
| Single/Two-Family new builds, additions and demolitions | $197.00 | Flat fee |
| Building Permit | ||
| $0 - $1,000 Construction Value | $81.75 | Flat fee |
| $1,001 - $100,000 Construction Value | $81.75 | Plus $13.50 per $1,000 over $1,000 |
| $100,001 - $300,000 Construction Value | $1,418.25 | Plus $12.75 per $1,000 over $100,000 |
| Over $300,000 Construction Value | $3,968.25 | Plus $10.25 per $1,000 over $300,000 |
| Demolition Costs | ||
| Buildings over 538 sq ft | $509 Inspection Fee | Plus $3.25 per sq ft Waste Service Fee |
| Plan Processing Fee | ||
| Paid at time of application. | 50% of estimated Building Permit Fee | Up to a max. of $10,000 |
| Plumbing Permit | ||
| Calculated per fixture. | $81.75 | $30.75 per fixture |
| Sign Permit | ||
| Fee is based on sign area. | $88 Application Fee | Plus permit fee e.g., $112 for signs < 15 m² |
| Tree Removal Permit | ||
| One tree per 12-month period. | $65.25 | Hazard trees are free $78.75 per additional tree |
Navigating Richmond Hall Shouldn't Delay Your Build
Municipal fees only cover plan review. Plan checking typically takes 4–8 weeks, depending on the municipality and project. That range is typical plan-check time, not a promise and not the date the permit is issued. Missing zoning data sheets or drawing details that do not meet the BC Building Code can bring a deficiency notice and add review time. Canadian Blueprint prepares permit drawing packages for municipal plan check. Where a city publishes a figure, treat it as review time, not the date the permit is issued.
Why Work With Canadian Blueprint
- ✓ Intake-Ready Drawing Sets Tailored specifically to Richmond municipal submittal standards.
- ✓ Zero Plan Examiner Surprises Full spatial separation, setback, and height zoning calculations.
- ✓ Deficiency Resolution Included Direct response to municipal comments to help keep your permit review moving.