Port Moody Permit Fees & Deposits Guide
Bylaw fee schedules, sliding valuation scales, refundable damage deposits, and required upfront plan check deposits for construction in Port Moody, BC.
When budgeting a construction or renovation project in Port Moody, municipal permit fees and refundable damage securities represent essential upfront expenditures. Rather than simple flat charges, Port Moody calculates building permit costs based on total construction value, paired with refundable damage deposits to protect public infrastructure.
Whether you are planning a secondary suite, laneway dwelling, custom single-family home, multiplex addition, or commercial tenant improvement, this guide clarifies how City Hall calculates fees, what securities are required at intake, and how to submit drawing packages for municipal plan review.
Port Moody Permit Fee Quick Calculator
Official Bylaw Sliding Scale Estimator
Select your project classification and enter estimated construction valuation below to calculate the base permit rate, upfront intake plan check deposit, and refundable damage deposits.
* Damage deposits are held by Port Moody and refunded upon final building inspection approval. These estimates do not include trade permits (plumbing, electrical, or gas), municipal development cost charges, amenity cost charges, or regional development cost charges. Those development-stage charges are often the largest cost on a new unit. As of Oct 2026.
How Port Moody Assesses Your Permit Fees
Value Assessment
City examiners evaluate declared contract costs against standardized valuation schedules ($/sq ft).
Bylaw Sliding Scale
Base fees scale progressively based on project scope, square footage, and declared value.
Security Deposits
Refundable damage deposit protects sidewalks, boulevards, curbs, and road assets during construction.
Intake Plan Check
An intake deposit initiates active plan examination with Port Moody building officials.
City of Port Moody - Building Permit Fees (Bylaw No. 3492)
Selected building, development, and administrative fees extracted from the City of Port Moody Fees Bylaw, 2024, No. 3492.
| Category / Project Scope | Minimum / Base Fee | Incremental Rate / Notes |
|---|---|---|
| Administrative & Miscellaneous Fees | ||
| Work Without Permit | Double Fees | |
| Permit Renewal Fee (Construction Started) | $266.00 | Minimum fee |
| Re-checking of Plans (Due to Revisions) | $164.00 | |
| Re-inspection Charge | $300.00 | If more than two inspections needed |
| Expedited Plan Review | $663.00 | |
| Damage Bond (New Single Dwelling) | $8,400.00 | |
| Property Info Research, Over 15 mins | $93.65 | First hour |
| Building Moves & Bonds | ||
| Moving a Building or Structure | $350.00 | |
| Inspection Fee for Building to be Moved | $200.00 | Additional $100/hr if over 2 hours |
| Temporary Building | $285.00 | |
| Security Bond for Exterior Work Completion | $26,520.00 | |
| Security Bond for Damage to City Property | $12,240.00 | |
| Liability Insurance Minimum Coverage | $5,100,000.00 | |
| Building Permit Valuation Fees | ||
| Fee Reduction (Professional Review) | 2.5% Reduction | On permit cost |
| Masonry Fireplace or Chimney | $118.32 | |
| Building Permit Valuation Fees (Construction Value) | ||
| $0 - $5,000 | $173.40 | Minimum permit fee |
| $5,001 - $20,000 | $23.97 | per $1,000 + $173.40 base |
| $20,001 - $50,000 | $16.32 | per $1,000 + $652.80 base |
| $50,001 - $500,000 | $12.50 | per $1,000 + $1,468.80 base |
| $500,001 and over | $11.22 | per $1,000 + $7,716.30 base |
| Digital Archive | ||
| Based on construction value | $33.66 - $821.10 | See detailed schedule |
| Plan Processing | ||
| Standard Projects | $175.00 | |
| New Single/Semi-Detached | $663.00 | With Professional: $646.43 |
| All Other Projects | 50% of estimated permit fee | Min $663.00 Max $5,457.00 |
Navigating Port Moody Hall Shouldn't Delay Your Build
Municipal fees only cover plan review. Plan checking typically takes 4–8 weeks, depending on the municipality and project. That range is typical plan-check time, not a promise and not the date the permit is issued. Missing zoning data sheets or drawing details that do not meet the BC Building Code can bring a deficiency notice and add review time. Canadian Blueprint prepares permit drawing packages for municipal plan check. Where a city publishes a figure, treat it as review time, not the date the permit is issued.
Why Work With Canadian Blueprint
- ✓ Intake-Ready Drawing Sets Tailored specifically to Port Moody municipal submittal standards.
- ✓ Zero Plan Examiner Surprises Full spatial separation, setback, and height zoning calculations.
- ✓ Deficiency Resolution Included Direct response to municipal comments to help keep your permit review moving.