Port Coquitlam Permit Fees & Deposits Guide
Bylaw fee schedules, sliding valuation scales, refundable damage deposits, and required upfront plan check deposits for construction in Port Coquitlam, BC.
When budgeting a construction or renovation project in Port Coquitlam, municipal permit fees and refundable damage securities represent essential upfront expenditures. Rather than simple flat charges, Port Coquitlam calculates building permit costs based on total construction value, paired with refundable damage deposits to protect public infrastructure.
Whether you are planning a secondary suite, laneway dwelling, custom single-family home, multiplex addition, or commercial tenant improvement, this guide clarifies how City Hall calculates fees, what securities are required at intake, and how to submit drawing packages for municipal plan review.
Port Coquitlam Permit Fee Quick Calculator
Official Bylaw Sliding Scale Estimator
Select your project classification and enter estimated construction valuation below to calculate the base permit rate, upfront intake plan check deposit, and refundable damage deposits.
* Damage deposits are held by Port Coquitlam and refunded upon final building inspection approval. These estimates do not include trade permits (plumbing, electrical, or gas), municipal development cost charges, amenity cost charges, or regional development cost charges. Those development-stage charges are often the largest cost on a new unit. As of Oct 2026.
How Port Coquitlam Assesses Your Permit Fees
Value Assessment
City examiners evaluate declared contract costs against standardized valuation schedules ($/sq ft).
Bylaw Sliding Scale
Base fees scale progressively based on project scope, square footage, and declared value.
Security Deposits
Refundable damage deposit protects sidewalks, boulevards, curbs, and road assets during construction.
Intake Plan Check
An intake deposit initiates active plan examination with Port Coquitlam building officials.
City of Port Coquitlam - 2025 Permit Fees Guide
A summary of common permit fees for new builds, renovations, and tenant improvements in Port Coquitlam, based on the 2025 fee schedule.
| Category / Project Scope | Minimum / Base Fee | Incremental Rate / Notes |
|---|---|---|
| Building Permit | ||
| $0 - $5,000 Construction Value | $120.00 | Flat fee |
| $5,001 - $50,000 Construction Value | $120.00 | Plus 1.6% of value Over $5,000 |
| $50,001 - $500,000 Construction Value | $840.00 | Plus 1.1% of value Over $50,000 |
| Over $500,000 Construction Value | $5,790.00 | Plus 0.9% of value Over $500,000 |
| Demolition Permit | ||
| For a standard building e.g., house. | $230 | Flat fee |
| Plumbing Permit | ||
| Fee is based on the number of fixtures. | $120.00 | Or $30 per fixture Whichever is greater. |
| Tree Cutting Permit | ||
| Does not apply to trees Deemed hazardous. | $100 | Per tree to be cut. |
Navigating Port Coquitlam Hall Shouldn't Delay Your Build
Municipal fees only cover plan review. Plan checking typically takes 4–8 weeks, depending on the municipality and project. That range is typical plan-check time, not a promise and not the date the permit is issued. Missing zoning data sheets or drawing details that do not meet the BC Building Code can bring a deficiency notice and add review time. Canadian Blueprint prepares permit drawing packages for municipal plan check. Where a city publishes a figure, treat it as review time, not the date the permit is issued.
Why Work With Canadian Blueprint
- ✓ Intake-Ready Drawing Sets Tailored specifically to Port Coquitlam municipal submittal standards.
- ✓ Zero Plan Examiner Surprises Full spatial separation, setback, and height zoning calculations.
- ✓ Deficiency Resolution Included Direct response to municipal comments to help keep your permit review moving.