New Westminster Permit Fees & Deposits Guide
Bylaw fee schedules, sliding valuation scales, refundable damage deposits, and required upfront plan check deposits for construction in New Westminster, BC.
When budgeting a construction or renovation project in New Westminster, municipal permit fees and refundable damage securities represent essential upfront expenditures. Rather than simple flat charges, New Westminster calculates building permit costs based on total construction value, paired with refundable damage deposits to protect public infrastructure.
Whether you are planning a secondary suite, laneway dwelling, custom single-family home, multiplex addition, or commercial tenant improvement, this guide clarifies how City Hall calculates fees, what securities are required at intake, and how to submit drawing packages for municipal plan review.
New Westminster Permit Fee Quick Calculator
Official Bylaw Sliding Scale Estimator
Select your project classification and enter estimated construction valuation below to calculate the base permit rate, upfront intake plan check deposit, and refundable damage deposits.
* Damage deposits are held by New Westminster and refunded upon final building inspection approval. These estimates do not include trade permits (plumbing, electrical, or gas), municipal development cost charges, amenity cost charges, or regional development cost charges. Those development-stage charges are often the largest cost on a new unit. As of Oct 2026.
How New Westminster Assesses Your Permit Fees
Value Assessment
City examiners evaluate declared contract costs against standardized valuation schedules ($/sq ft).
Bylaw Sliding Scale
Base fees scale progressively based on project scope, square footage, and declared value.
Security Deposits
Refundable damage deposit protects sidewalks, boulevards, curbs, and road assets during construction.
Intake Plan Check
An intake deposit initiates active plan examination with New Westminster building officials.
City of New Westminster - Building Permit Fees (Bylaw No. 8478)
Selected building permit, administrative, and related fees extracted from Schedule ‘A’ of the City of New Westminster Bylaw No. 8478, 2024.
| Category / Project Scope | Minimum / Base Fee | Incremental Rate / Notes |
|---|---|---|
| Building Permit Valuation Fees | ||
| Application Fee | $165.00 | Non-refundable |
| Construction Value Up to $50,000 | $18.00 | per $1,000 (or fraction thereof) |
| Construction Value $50,001 - $150,000 | $16.00 | per $1,000 (or fraction thereof) |
| Construction Value Over $150,000 | $14.00 | per $1,000 (or fraction thereof) |
| Plan Review Fee (Collected at Application) | 50% of total Building Permit Fee | Min $165.00 Max $20,000.00 Non-refundable |
| Discount for Registered Professionals | 1% Discount | On building permit fee (Max $500.00) |
| Demolition Permits | ||
| Application Fee | $165.00 | Non-refundable |
| Permit Fee (Accessory Building) | $165.00 | Per building |
| Permit Fee (All Other Structures) | $1,405.00 | Minimum fee |
| Waste Recycling Fee (Single Family / Comm.) | $301 non-refundable + $5,305 refundable | Per building |
| Waste Recycling Fee (Accessory Structures) | $301 non-refundable + $1,592 refundable | Per building |
| Administrative & Miscellaneous | ||
| Work Without Permit (Penalty) | Double Permit Fee | Max penalty of $25,000.00 |
| Permit Extension | $165.00 | Plus $82.50/hour for staff review time |
| Permit Transfer (Owner or Contractor) | $165.00 | Plus $82.50/hour for staff review time |
| Revisions to Permit (Prior to or after issuance) | $165.00 | Minimum fee, or $82.50/hour staff time |
| Alternate Solution Review | $579.00 | Up to two items (plus GST) |
| Inspections | ||
| Re-inspection Fee (3rd Inspection) | $165.00 | Plus GST |
| Re-inspection Fee (4th Inspection) | $324.00 | Plus GST |
| Re-inspection Fee (5th Inspection) | $484.00 | Plus GST |
| Special Inspection (During normal hours) | $165.00 | Minimum fee, or $82.50/hour staff time |
| Bonds & Securities | ||
| Delayed Demolition Security Deposit | $50,000.00 | |
| Temporary Building Security Deposit | $25,000.00 | |
| Sign Permits | ||
| New Sign | $558.00 | |
| Face Change (Existing Permitted Sign) | $165.00 | |
Navigating New Westminster Hall Shouldn't Delay Your Build
Municipal fees only cover plan review. Plan checking typically takes 4–8 weeks, depending on the municipality and project. That range is typical plan-check time, not a promise and not the date the permit is issued. Missing zoning data sheets or drawing details that do not meet the BC Building Code can bring a deficiency notice and add review time. Canadian Blueprint prepares permit drawing packages for municipal plan check. Where a city publishes a figure, treat it as review time, not the date the permit is issued.
Why Work With Canadian Blueprint
- ✓ Intake-Ready Drawing Sets Tailored specifically to New Westminster municipal submittal standards.
- ✓ Zero Plan Examiner Surprises Full spatial separation, setback, and height zoning calculations.
- ✓ Deficiency Resolution Included Direct response to municipal comments to help keep your permit review moving.