Skip to content
Nanaimo Building Permit Fees
Permit Fee Schedule & Costs

Nanaimo Permit Fees & Deposits Guide

Bylaw fee schedules, sliding valuation scales, refundable damage deposits, and required upfront plan check deposits for construction in Nanaimo, BC.

← Back to Nanaimo Resource Hub • Updated for Active BC Bylaw Rates

When budgeting a construction or renovation project in Nanaimo, municipal permit fees and refundable damage securities represent essential upfront expenditures. Rather than simple flat charges, Nanaimo calculates building permit costs based on total construction value, paired with refundable damage deposits to protect public infrastructure.

Whether you are planning a secondary suite, laneway dwelling, custom single-family home, multiplex addition, or commercial tenant improvement, this guide clarifies how City Hall calculates fees, what securities are required at intake, and how to submit drawing packages for municipal plan review.

Nanaimo Permit Fee Quick Calculator

Official Bylaw Sliding Scale Estimator

Select your project classification and enter estimated construction valuation below to calculate the base permit rate, upfront intake plan check deposit, and refundable damage deposits.

Municipal Fee Notice: These figures calculate official statutory review charges and refundable damage deposits collected directly by Nanaimo City Hall. They do not include Canadian Blueprint's drafting or design pricing.
Explore Design Pricing →
$
Estimated Base Permit Fee $0.00 City of Nanaimo Fees and Charges Bylaw 2021 No. 7336 (consolidated 2026-JUN-01)
Upfront Intake Deposit $0.00 Plan check charge credited toward permit
Refundable Damage Deposit $0.00 Subject to municipal site inspection
City Hall Fees Only: 100% of these calculated figures are statutory municipal charges paid directly to Nanaimo City Hall during permit intake. They do not include Canadian Blueprint's drafting, design, or engineering fees.
Explore Design Pricing →

* Damage deposits are held by Nanaimo and refunded upon final building inspection approval. These estimates do not include trade permits (plumbing, electrical, or gas), municipal development cost charges, amenity cost charges, or regional development cost charges. Those development-stage charges are often the largest cost on a new unit. As of Oct 2026.

Step-by-Step Breakdown

How Nanaimo Assesses Your Permit Fees

1

Value Assessment

City examiners evaluate declared contract costs against standardized valuation schedules ($/sq ft).

2

Bylaw Sliding Scale

Base fees scale progressively based on project scope, square footage, and declared value.

3

Security Deposits

Refundable damage deposit protects sidewalks, boulevards, curbs, and road assets during construction.

4

Intake Plan Check

An intake deposit initiates active plan examination with Nanaimo building officials.

Official Municipal Rates

Permit Fee Structure

City of Nanaimo fees are set by the Building Bylaw based on estimated construction values and plan-check categories.

Official Nanaimo Building Bylaw Fees
Notice: Fees are estimates based on municipal bylaws and subject to City of Nanaimo verification during intake.
Category / Project Scope Minimum / Base Fee Incremental Rate / Notes
Minimum Permit Fee
Fees and Charges Bylaw 2021 No. 7336 (covers the first $1,000 of value). $105 first $1,000 of value
Construction Value ($1k–$100k)
Applies to all building permit classes. $10 per $1,000 valuation
Construction Value (Over $100k)
Applies to all building permit classes. $7 per $1,000 valuation
Application Fee (Value Over $20k)
Paid at application and credited toward the permit; retained if the project does not proceed. $175 or 10% of permit fee
Skip City Hall Red Tape

Navigating Nanaimo Hall Shouldn't Delay Your Build

Municipal fees only cover plan review. Plan checking typically takes 4–8 weeks, depending on the municipality and project. That range is typical plan-check time, not a promise and not the date the permit is issued. Missing zoning data sheets or drawing details that do not meet the BC Building Code can bring a deficiency notice and add review time. Canadian Blueprint prepares permit drawing packages for municipal plan check. Where a city publishes a figure, treat it as review time, not the date the permit is issued.

Get a Free Permit Quote → Permit drawing packages for municipal plan check

Why Work With Canadian Blueprint

  • ✓
    Intake-Ready Drawing Sets Tailored specifically to Nanaimo municipal submittal standards.
  • ✓
    Zero Plan Examiner Surprises Full spatial separation, setback, and height zoning calculations.
  • ✓
    Deficiency Resolution Included Direct response to municipal comments to help keep your permit review moving.
Navigation & Portals

Related Nanaimo Permit Resources