Nanaimo Permit Fees & Deposits Guide
Bylaw fee schedules, sliding valuation scales, refundable damage deposits, and required upfront plan check deposits for construction in Nanaimo, BC.
When budgeting a construction or renovation project in Nanaimo, municipal permit fees and refundable damage securities represent essential upfront expenditures. Rather than simple flat charges, Nanaimo calculates building permit costs based on total construction value, paired with refundable damage deposits to protect public infrastructure.
Whether you are planning a secondary suite, laneway dwelling, custom single-family home, multiplex addition, or commercial tenant improvement, this guide clarifies how City Hall calculates fees, what securities are required at intake, and how to submit drawing packages for municipal plan review.
Nanaimo Permit Fee Quick Calculator
Official Bylaw Sliding Scale Estimator
Select your project classification and enter estimated construction valuation below to calculate the base permit rate, upfront intake plan check deposit, and refundable damage deposits.
* Damage deposits are held by Nanaimo and refunded upon final building inspection approval. These estimates do not include trade permits (plumbing, electrical, or gas), municipal development cost charges, amenity cost charges, or regional development cost charges. Those development-stage charges are often the largest cost on a new unit. As of Oct 2026.
How Nanaimo Assesses Your Permit Fees
Value Assessment
City examiners evaluate declared contract costs against standardized valuation schedules ($/sq ft).
Bylaw Sliding Scale
Base fees scale progressively based on project scope, square footage, and declared value.
Security Deposits
Refundable damage deposit protects sidewalks, boulevards, curbs, and road assets during construction.
Intake Plan Check
An intake deposit initiates active plan examination with Nanaimo building officials.
Permit Fee Structure
City of Nanaimo fees are set by the Building Bylaw based on estimated construction values and plan-check categories.
| Category / Project Scope | Minimum / Base Fee | Incremental Rate / Notes |
|---|---|---|
| Minimum Permit Fee | ||
| Fees and Charges Bylaw 2021 No. 7336 (covers the first $1,000 of value). | $105 | first $1,000 of value |
| Construction Value ($1k–$100k) | ||
| Applies to all building permit classes. | $10 | per $1,000 valuation |
| Construction Value (Over $100k) | ||
| Applies to all building permit classes. | $7 | per $1,000 valuation |
| Application Fee (Value Over $20k) | ||
| Paid at application and credited toward the permit; retained if the project does not proceed. | $175 | or 10% of permit fee |
Navigating Nanaimo Hall Shouldn't Delay Your Build
Municipal fees only cover plan review. Plan checking typically takes 4–8 weeks, depending on the municipality and project. That range is typical plan-check time, not a promise and not the date the permit is issued. Missing zoning data sheets or drawing details that do not meet the BC Building Code can bring a deficiency notice and add review time. Canadian Blueprint prepares permit drawing packages for municipal plan check. Where a city publishes a figure, treat it as review time, not the date the permit is issued.
Why Work With Canadian Blueprint
- ✓ Intake-Ready Drawing Sets Tailored specifically to Nanaimo municipal submittal standards.
- ✓ Zero Plan Examiner Surprises Full spatial separation, setback, and height zoning calculations.
- ✓ Deficiency Resolution Included Direct response to municipal comments to help keep your permit review moving.