Skip to content
Kelowna Building Permit Fees
Permit Fee Schedule & Costs

Kelowna Permit Fees & Deposits Guide

Bylaw fee schedules, sliding valuation scales, refundable damage deposits, and required upfront plan check deposits for construction in Kelowna, BC.

← Back to Kelowna Resource Hub • Updated for Active BC Bylaw Rates

When budgeting a construction or renovation project in Kelowna, municipal permit fees and refundable damage securities represent essential upfront expenditures. Rather than simple flat charges, Kelowna calculates building permit costs based on total construction value, paired with refundable damage deposits to protect public infrastructure.

Whether you are planning a secondary suite, laneway dwelling, custom single-family home, multiplex addition, or commercial tenant improvement, this guide clarifies how City Hall calculates fees, what securities are required at intake, and how to submit drawing packages for municipal plan review.

Kelowna Permit Fee Quick Calculator

Official Bylaw Sliding Scale Estimator

Select your project classification and enter estimated construction valuation below to calculate the base permit rate, upfront intake plan check deposit, and refundable damage deposits.

Municipal Fee Notice: These figures calculate official statutory review charges and refundable damage deposits collected directly by Kelowna City Hall. They do not include Canadian Blueprint's drafting or design pricing.
Explore Design Pricing →
$
Estimated Base Permit Fee $0.00 Kelowna Building Bylaw Fee Schedule
Upfront Intake Deposit $0.00 Plan check charge credited toward permit
Refundable Damage Deposit $0.00 Subject to municipal site inspection
City Hall Fees Only: 100% of these calculated figures are statutory municipal charges paid directly to Kelowna City Hall during permit intake. They do not include Canadian Blueprint's drafting, design, or engineering fees.
Explore Design Pricing →

* Damage deposits are held by Kelowna and refunded upon final building inspection approval. These estimates do not include trade permits (plumbing, electrical, or gas), municipal development cost charges, amenity cost charges, or regional development cost charges. Those development-stage charges are often the largest cost on a new unit. As of Oct 2026.

Step-by-Step Breakdown

How Kelowna Assesses Your Permit Fees

1

Value Assessment

City examiners evaluate declared contract costs against standardized valuation schedules ($/sq ft).

2

Bylaw Sliding Scale

Base fees scale progressively based on project scope, square footage, and declared value.

3

Security Deposits

Refundable damage deposit protects sidewalks, boulevards, curbs, and road assets during construction.

4

Intake Plan Check

An intake deposit initiates active plan examination with Kelowna building officials.

Official Municipal Rates

2025 Permit Fees & Costs Guide

Typical 2025 permit fees for homes, renovations, and commercial projects. Fees are usually paid in stages.

Development Cost Charge Bylaw
Notice: This is a guide only and based on the most recent data. Official fees are determined by the City at the time of application and are subject to change. [4, 11]
Category / Project Scope Minimum / Base Fee Incremental Rate / Notes
Alternative Solution
Examination of requests
for alternatives
$200.00 Per alternative solution
Building Permit
$1 - $10,000
Construction Value
$175.00 Non-refundable
$10,001 - $100,000
Construction Value
$175.00 Plus $9.55 per $1,000
(or portion)
$100,001 - $500,000
Construction Value
$1,034.50 Plus $8.05 per $1,000
(or portion)
Over $500,000
Construction Value
$4,254.50 Plus $7.20 per $1,000
(or portion)
Construction Commenced Prior to Permit
Penalty where work started
before permit issued
Double applicable
permit fee
Capped at $1,000.00
Demolition Permit
Per building $175.00 Flat fee
Fee Adjustments & Alternatives
Permit fee reduction for
PE/Architect certification
5% Reduction When City relies in writing
on registered professional
Heating & Ventilating
Masonry / metal
chimneys
See valuation
schedule
Based on Building
Permit valuation tiers
Solid fuel burning
appliances (incl. chimneys)
$175.00 Per appliance
Canopies for commercial
cooking appliances
$175.00 Per canopy
Inspections & Re-inspection
Re-inspection $150.00
Inspections not
specifically described
$60.00
Permit Administration
Permit transfer
or assignment
$150.00
Permit extension $100.00
Permit Refunds
Permit fee refund
(work not commenced)
Permit fee less greater
of $175 or 25% of fee
Requires original receipt
Plan Review / Additional Checking
Additional plan checking
(revisions / repeats)
$60.00 Per hour or part thereof
(minimum charge applies)
Retaining Walls
Permit fee See valuation
schedule
Based on Building
Permit valuation tiers
Secondary Suite
Secondary suite permit $510.00 Flat fee
Skip City Hall Red Tape

Navigating Kelowna Hall Shouldn't Delay Your Build

Municipal fees only cover plan review. Plan checking typically takes 4–8 weeks, depending on the municipality and project. That range is typical plan-check time, not a promise and not the date the permit is issued. Missing zoning data sheets or drawing details that do not meet the BC Building Code can bring a deficiency notice and add review time. Canadian Blueprint prepares permit drawing packages for municipal plan check. Where a city publishes a figure, treat it as review time, not the date the permit is issued.

Get a Free Permit Quote → Permit drawing packages for municipal plan check

Why Work With Canadian Blueprint

  • ✓
    Intake-Ready Drawing Sets Tailored specifically to Kelowna municipal submittal standards.
  • ✓
    Zero Plan Examiner Surprises Full spatial separation, setback, and height zoning calculations.
  • ✓
    Deficiency Resolution Included Direct response to municipal comments to help keep your permit review moving.
Navigation & Portals

Related Kelowna Permit Resources