Skip to content
Pendrell Mews Condo Interior Renovation | Canadian Blueprint feature image
Renovation

Pendrell Mews Condo Interior Renovation

West End, Vancouver, BC
  1. 1
    Pre-Renovation As-Built Laser Survey & Wall Verification
  2. 2
    Building Permit Drafting & Plumbing Alteration Plans
  3. 3
    Strata Council Alteration Approval Liaison & Acoustic Specs
  4. 4
    City of Vancouver Building Permit Submission & Clearance
Project Type
Renovation
Location
West End, Vancouver, BC
Scope
Condo Interior Alteration, Strata Review & Vancouver Building Permit
Location
West End, Vancouver, BC
Building
Pendrell Mews Residential Condominium (Strata LMS1491)
Authority
City of Vancouver Building Department & Strata Council
Standard
Vancouver Building By-law (VBBL) & Strata Acoustic Bylaws
Outcome
Successfully permitted & built
← Back to Renovation Projects

At Pendrell Mews in Vancouver's West End, Canadian Blueprint teamed up with general contractor Rosso Renovations Ltd. (Brad Rosso) to transform a classic compartmentalized strata apartment into an expansive, light-filled modern home. Our role was delivering the complete building permit drawing set, verifying non-bearing wall removals, navigating strict strata acoustic bylaws, and securing rapid permit clearance under the Vancouver Building By-law (VBBL).

The Challenge: Dual-Track Strata & Municipal Permitting in the West End

Executing high-end multi-family alterations in Vancouver requires satisfying two separate regulatory gatekeepers simultaneously: the Strata Corporation (LMS1491) and the City of Vancouver Building Department. At Pendrell Mews, opening up the kitchen, dining, and living areas required verifying that the demising partitions were non-bearing and did not compromise vertical fire separations or building shear walls. In addition, strata council bylaws enforced strict sound attenuation requirements: replacing aged carpet with modern wide-plank hardwood over existing concrete floor slabs required certified Impact Insulation Class (IIC 72+) underlayment details and vibration isolation around plumbing stacks to prevent impact noise transfer to neighbouring suites below.

Technical Scope of Work: Precision Drawings & Strata Coordination

Canadian Blueprint developed fully coordinated permit drawings in Autodesk Revit tailored for municipal plan review and strata council alteration sign-off:

  • As-Built Laser Survey: Conducted comprehensive spatial verification documenting structural concrete columns, ceiling mechanical drops, demising wall locations, door swings, and vertical pipe risers.
  • Demolition & Proposed Space Planning: Outlined selective non-bearing partition removals connecting the kitchen to the main living area, defining clear circulation paths, fixture clearances, and updated room schedules.
  • Acoustic Membrane Floor Assembly Schedules: Documented high-performance acoustic underlayment specifications fulfilling strata corporation bylaws (minimum IIC 72 rating) over the suspended concrete slab.
  • Plumbing & Electrical Coordination: Reconfigured fixture layouts for the chef kitchen and spa ensuite bathroom without core-drilling into the concrete slab, maintaining clean gravity drainage within the unit's raised floor zones.
  • City of Vancouver Building Permit Liaison: Formulated code compliance notes under the Vancouver Building By-law (VBBL), coordinating prompt responses to municipal plan reviewers for quick permit issuance.

The Transformation: Space, Light & Craftsmanship

With clear permit drawings and strata approvals in place, Rosso Renovations executed a comprehensive interior overhaul that completely modernized the suite:

Open-Concept Living & Kitchen

Removing the wall dividing the kitchen and living room created an inviting open floor plan. A quartz waterfall island anchors the kitchen, while wide-plank white oak flooring runs seamlessly over the sound-deadening acoustic underlay.

Ensuite Spa Bathroom

The reimagined ensuite bathroom features a curbless walk-in glass shower, fluted white oak double vanity, and concealed linear drainage engineered within existing slab tolerances.

Primary Bedroom Retreat

Floor-to-ceiling windows frame West End greenery, complemented by custom built-in wardrobe millwork that provides extensive integrated storage while maintaining clean, uncluttered sightlines.

The Outcome: Full Strata Clearance & Rapid Permit Clearance

Permit Issued · City of Vancouver & Strata Council LMS1491 Approved

With coordinated permit drawings and certified acoustic specifications, Rosso Renovations obtained both strata council approval and the City of Vancouver building permit without delay. On-site framing and mechanical trades began immediately without idle time, turning an outdated West End condo into a showpiece residential transformation.

Brad Rosso
Brad Rosso
Principal & General Contractor,
Rosso Renovations Ltd. ↗
"Good service. Got my drawing quickly. They made any changes I needed, and answered all questions when submitting to the city. Highly recommended."
Edward Vega
Edward Vega
Certified Technician (CTech), ASTTBC, Canadian Blueprint Inc.
Owner Response
"Thank you Brad! Always a pleasure collaborating with Rosso Renovations on Pendrell Mews and across our 7 projects together. Ensuring smooth strata approvals and rapid City of Vancouver building permit clearance keeps great construction projects moving on time."

Planning a Similar Project?

We evaluate BC Building Code compliance, municipal zoning, and prepare permit-ready drawing packages with clear, guaranteed quotes.

Long-Standing Partnership 7 Completed Collaborations

A Proven Permit Drafting Partner for Rosso Renovations Ltd.

The Pendrell Mews transformation represents one of many successful collaborations between Canadian Blueprint and general contractor Brad Rosso. Over an enduring 7-project partnership spanning the City of Vancouver, Delta, and West Vancouver, Canadian Blueprint serves as the dedicated permit drafting and code coordination partner for Rosso Renovations Ltd.—delivering predictable turnaround, strata liaison, and prompt responses to municipal plan-checker inquiries.

7
Permits Issued
All 7 Approved
3
Municipalities
Vancouver · Delta · West Van
24–48h
Plan-Check Turn
Rapid Amendments
$0
Billing Extras
Fixed Cost Certainty

Collaborative Project Matrix (7 Verified Approvals)

Multi-jurisdiction track record delivered in ongoing partnership with Rosso Renovations Ltd.

Project & Typology Location & Code Key Scope & Technical Hurdles Resolved Permit Status
Pendrell Mews Condo Interior Alteration
Strata Condo Alteration
West End, Vancouver
VBBL Part 9 / Strata
Non-bearing partition removals connecting kitchen and living area, plumbing relocations, acoustic underlayment (IIC 72), City of Vancouver permit clearance. Permit Issued
Pendrell Mews Suite Modernization
Strata Condo Alteration
West End, Vancouver
VBBL Part 9 / Strata
Second suite alteration in the same residential complex; complete interior re-planning, strata council alteration review, and expedited municipal permit drafting. Permit Issued
Salal Drive Strata Condo Modernization
Strata Condo Alteration
Kitsilano, Vancouver
VBBL Part 9 / Strata
Multi-family strata suite interior alteration, bathroom and kitchen layout modernization, demising wall acoustic verification, and Vancouver Building By-law compliance. Permit Issued
Commercial Tenant Improvement & Digital Scan
Commercial Assembly TI
Vancouver, BC
VBBL Part 3 (Commercial TI)
Comprehensive 3D spatial scan, commercial interior tenant improvement layout, occupant load calculations, barrier-free travel paths, and municipal plan review submission. Permit Issued
Single-Family Addition & Structural Overhaul
Residential Addition
Delta, BC
BCBC Part 9 (Housing)
Ground-floor residential addition, structural load-bearing wall removal coordinated with registered professional engineer (P.Eng), open-concept kitchen expansion, Delta permit clearance. Permit Issued
Scarborough Drive Full-Home Modernization
Residential Renovation
North Delta, BC
BCBC Part 9 (Housing)
Substantial residential interior alteration, kitchen expansion, structural flush beam drops, spatial layout optimization, and Delta building department approvals. Permit Issued
Marine Drive Multi-Storey Elevator Addition
Elevator Shaft Addition
West Vancouver, BC
BCBC Part 9 (DWV Bylaws)
Specialized vertical accessibility shaft addition, multi-level structural framing and roof alterations, District of West Vancouver building permit and steep-slope zoning coordination. Permit Issued