Skip to content
Border Burrito | Vancouver Commercial Kitchen TI feature image
Commercial TI

Border Burrito

Renfrew-Collingwood, Vancouver, BC
  1. 1
    Occupancy & Load Restrictions
  2. 2
    Fire Separation Detailing
  3. 3
    Egress & Life Safety Audit
  4. 4
    Building Permit Drawings
Project Type
Commercial TI
Location
Renfrew-Collingwood,
Vancouver, BC
Scope
Commercial Food Service TI (Take-Out Only)
Facility
Border Burrito
Location
Renfrew-Collingwood, Vancouver, BC
Footprint / Occupancy
532 SF | Group A2 Assembly Occupancy
Zoning
C-1 Commercial
Code Standard
VBBL 2019 Compliance
Jurisdiction
City of Vancouver Building Dept.
Outcome
Successfully permitted & built
← Back to Commercial Projects

The Border Burrito project involved a 532 SF commercial food service tenant improvement for a take-out-only establishment in the Boundary Road commercial corridor of Renfrew-Collingwood, Vancouver, BC. Operating within a C-1 zoned, non-sprinklered mixed-use building under VBBL 2019, our team detailed strict Group A2 fire separations, occupant load restrictions, and a complete building permit drawing package for the City of Vancouver.

The Challenge

Integrating a Group A2 Assembly occupancy into a mixed-use 7,691 SF non-sprinklered building requires exact fire separation math. With Medical Offices (Group D) and Mercantile (Group E) sharing the shell, the Vancouver Building By-law demands strict 1-hour and 2-hour Fire-Resistance Ratings between these major occupancies. We took extra time on the front end to verify the existing structural fire separations and limit the occupant load strictly to staff for a take-out-only model. Ironing out this strict VBBL compliance early saves you from massive framing overhauls or rejected health and safety inspections from the City later.

Technical Scope of Work

To secure the TI permit for this commercial kitchen under VBBL 2019, we executed the following requirements:

  • Occupancy & Load Restrictions: Engineered the 532 SF layout specifically as a take-out-only operation, capping the occupant load at 3 employees. This strategic classification bypassed the need for universal public washrooms, satisfying VBBL 3.7.2.2.(4) with a single shared staff facility.
  • Fire Separation Detailing: Mapped the strict fire separations required within the non-sprinklered shell, detailing the 1-hour separation to adjacent Group D occupancies and the 2-hour separation to Group E mercantile zones.
  • Egress & Life Safety: Audited the unit's exit capacity, proving the existing 72-inch egress path vastly exceeded the minimal 0.72-inch requirement for the 3-person staff load.
  • Commercial Kitchen & Grease Trap Plumbing: Coordinated commercial kitchen equipment layouts, Type 1 ventilation hood clearances, and grease interceptor (grease trap) plumbing details in full compliance with Vancouver Engineering & Metro Vancouver liquid waste bylaws.
  • Building Permit Drawings: Delivered a comprehensive, fully coordinated set of commercial kitchen building permit drawings, establishing required equipment clearances and life-safety baselines for municipal review.

The Outcome

Commercial Kitchen TI Permit Approved in Vancouver

By front-loading the complex fire separation analysis and strategically capping the occupant load, we delivered a clear, coordinated permit package. This proactive approach kept the City of Vancouver file coordinated and allowed the general contractor to execute a lean build-out for Border Burrito's take-out operation.

Sheila & Jose
Sheila & Jose
Owners, Border Burrito
"Edward and the team at Canadian Blueprint were a great help to us in the planning of our take-out restaurant. They completed our floor plans and all the necessary edits throughout the process very quickly. They answered all of our questions and made the whole process easy to understand. We would highly recommend them to anyone needing building permit and design services."
Edward Vega
Edward Vega
Certified Technician (CTech), ASTTBC, Canadian Blueprint Inc.
Owner Response
"Thank you Sheila and Jose! It was a real pleasure collaborating on the commercial tenant improvement and kitchen plans for Border Burrito on Boundary Road."

Planning a Similar Project?

We evaluate BC Building Code compliance, municipal zoning, and prepare permit-ready drawing packages with clear, guaranteed quotes.